Final | 10/6/2000 | 10/9/2000 | 10/9/2000 | A | PASS |
Alan Hauser
|
|
|
Access is 2000 Enter ###-####
|
Final | 10/5/2000 | 10/6/2000 | 10/6/2000 | A | NR |
Alan Hauser
|
|
|
###-#### Access is 2000enter
|
Pressure Test | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 15:28:41. Contact: ###-####. ..wrong permit # called in 8/29/2000 11:11:49 AM
|
Pressure Test | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 10:45:49. Contact: ###-####.
|
Rough-in | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 08:33:59. Contact: ###-####. no pressure test 8/1/00 4:52:22 PM no pressure test 8/1/00 4:53:08 PM
|