Final | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 13:11:05. Contact: ###-####.
|
Rough-in | 7/21/2000 | 7/24/2000 | 7/24/2000 | A | PASS |
Dixie Fellows
|
|
|
f\p only was not done at fram\\###-####..f/p ok 7/24/00 10:40:57 AM
|
Pressure Test | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 16:19:42. Contact: ###-####.
|
Rough-in | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 14:33:10. Contact: ###-####.
|