Final | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 12:44:27. Contact: ###-####. gas line presure tes ok final ok. 9/14/2000 9:56:22 AM
|
Pressure Test | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Russ Owen
|
|
|
Joesph ###-####c/n posted 16 psi needs 20 9/7/2000 3:45:13 PM
|
Rough-in | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:23:11. Contact: ###-####.
|
Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PART |
Dave Lightfoot
|
|
|
fireplace Shane ###-#### Need to complete exhaust fan correction. 7/19/00 3:29:24 PM
|
Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 07:12:39. Contact: ###-####. Complete exhaust farducts 7/18/00 2:41:18 PM
|