Final | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
Final | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | FAIL |
Alan Hauser
|
|
|
reinspection larz ###-####
|
Final | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Tried to call...C/N issued. 9/14/2000 2:14:41 PM
|
Pressure Test | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PASS |
Dixie Fellows
|
|
|
Lars ###-####
|
Pressure Test | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Dixie Fellows
|
|
|
lars reinspection need full 1" gas to furn/wh 7/18/00 1:33:22 PM
|
Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | FAIL |
Alan Hauser
|
|
|
###-#### cancelled rescheduled by lars
|
Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | PASS |
Dixie Fellows
|
|
|
p/t lars ###-#### reinspection
|
Pressure Test | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | FAIL |
Alan Hauser
|
|
|
|
Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | FAIL |
Alan Hauser
|
|
|
###-#### $42.00 reinspection fee 7/18/00 1:24:54 PM
|
Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | FAIL |
Alan Hauser
|
|
|
###-#### Called 7/14/00 2:39:52 PM
|