Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 12:49:15. Contact: ###-####.
|
Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 | A | FAIL |
Dixie Fellows
|
|
|
meagon ###-#### 2 f/p finish framing back of f/p 8/15/2000 9:17:07 AM
|
Final | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | FAIL |
Dixie Fellows
|
|
|
meagan ###-#### for f/p only
|