Final | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 10:06:23. Contact: ###-####.
|
Final | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 10:06:23. Contact: ###-####.
|
Rough-in | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 11:57:06. Contact: ###-####. Done #411 7/28/00 1:18:18 PM
|
Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 17:10:40. Contact: ###-####....need top stand offs at f/p 7/27/00 10:44:58 AM
|