Final | 3/15/2001 | 3/19/2001 | 3/19/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 13:07:48. Contact: ###-####. sign occ card 3/19/2001 11:48:16 AM
|
Rough-in | 1/5/2001 | 1/5/2001 | 1/5/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 09:06:48. Contact: ###-####.PARTIAL ONLY ok for ceiling cover 1/5/2001 2:31:23 PM
|
Rough-in | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 16:18:14. Contact: ###-####. partial r/i above ceiling
|