Final | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 16:47:51. Contact: ###-####.
|
Rough-in | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PASS |
Alan Hauser
|
|
|
r/i p/t as per dixie No pressure test requested 8/7/00 8:39:02 AM
|
Pressure Test | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 08:51:55. Contact: ###-####. will do fri am 8/4/2000 8:05:01 AM
|
Rough-in | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 08:51:33. Contact: ###-####. will do fri am 8/4/2000 8:04:46 AM
|