Final | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 10:08:51. Contact: ###-####. sign occ card 10/18/2000 3:04:29 PM
|
Rough-in | 10/12/2000 | 10/13/2000 | 10/13/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/12/2000 at 12:58:10. Contact: ###-####.
|
Rough-in | 9/12/2000 | 9/12/2000 | 9/12/2000 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 08:03:40. Contact: ###-####.
|
Final | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 10:56:11. Contact: ###-####. As per Amanda w/tml wrong one called in. it should of been mec00-01832
|