Final | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 13:38:19. Contact: ###-####.
|
Final | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | FAIL |
Dave Hannah
|
|
|
MARK ###-#### FN
|
Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PASS |
Tom Arcoraci
|
|
|
tony --###-#### r/i
|
Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 12:08:39. Contact: ###-####.
|
Pressure Test | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | FAIL |
Dixie Fellows
|
|
|
toni ###-####..GAS PIPE UNDERSIZED 8/3/2000 8:23:05 AM
|