Final | 9/19/2000 | 9/20/2000 | 9/20/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/19/2000 at 13:01:43. Contact: ###-####.
|
Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 08:42:20. Contact: ###-####.
|
Rough-in | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 14:45:54. Contact: ###-####. seal r/a at 2nd floor...screw penetr inner liner of b-vent 8/4/2000 10:07:12 AM
|