Final | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PASS |
Alan Hauser
|
|
|
greg ###-####
|
Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 08:55:08. Contact: ###-####.
|
Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 8/15/2000
|
Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 07:45:49. Contact: ###-####. $42 reinspection fee 8/14/2000 6:05:46 PM
|
Rough-in | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | FAIL |
Tom Arcoraci
|
|
|
cn posted verify w/h size for comb air duct sizing no phone number in inspec request to call contractor 8/11/2000 1:59:28 PM
|
Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 16:44:25. Contact: ###-####...68 b-2 8/10/2000 11:59:05 AM
|
Rough-in | 8/9/2000 | 8/9/2000 | 8/9/2000 | P | FAIL |
Alan Hauser
|
|
|
###-####=greg r/i -re-insp NR as per #340 8/10/00 11:21:58 AM
|
Pressure Test | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | PASS |
Dave Lightfoot
|
|
|
GREGG-- ###-#### PRES TEST
|
Rough-in | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | FAIL |
Dave Lightfoot
|
|
|
GREGG ###-#### R/I cn posted 8/10/2000 7:59:55 AM
|