Final | 10/31/2000 | 10/31/2000 | 10/31/2000 | A | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 10/31/2000
|
Final | 10/31/2000 | 10/31/2000 | 10/31/2000 | A | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 10/31/2000
|
Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:59:36. Contact: ###-####. NO ACCESS TO ATTIC..SCREW IN DRYER VENT 10/30/2000 2:22:54 PM
|
Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 16:02:15. Contact: ###-####.
|
Pressure Test | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | PASS |
Tom Arcoraci
|
|
|
jan ###-####
|
Rough-in | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted 8/9/2000 12:01:34 PM
|