Final | 6/14/2001 | 6/15/2001 | 6/15/2001 | P | FAIL |
Alan Hauser
|
|
|
call first Sam ###-#### house locked, called contractor 6/14/2001 1:36:10 PM
|
Final | 6/14/2001 | 6/15/2001 | 6/15/2001 | P | PASS |
Alan Hauser
|
|
|
###-####
|
Pressure Test | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 08:10:37. Contact: ###-####.
|
Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 08:10:08. Contact: ###-####.
|