Final | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 16:39:41. Contact: ###-####. DOOR CODE 0987
|
Pressure Test | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 11:36:10. Contact: ###-####. FOR THE BARBEQUE
|
Pressure Test | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 12:40:00. Contact: ###-####.
|
Pressure Test | 8/25/2000 | 8/28/2000 | 8/28/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 11:34:41. Contact: ###-####. gas pipe covered with sheet rock 8/28/2000 10:55:13 AM
|
Rough-in | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PASS |
Alan Hauser
|
|
|
Fireplace; Tomorrow-###-####
|
Rough-in | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | PASS |
Alan Hauser
|
|
|
fireplace Tomorrow ###-####
|
Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 09:48:23. Contact: ###-####.
|