Final | 10/26/2000 | 10/30/2000 | 10/30/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 12:53:08. Contact: ###-####.unable to get in floor being layed.left note to recall. 10/30/2000 2:12:09 PM
|
Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 09:57:47. Contact: ###-####.
|
Rough-in | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/18/2000 at 08:51:28. Contact: ###-####.
|
Pressure Test | 8/15/2000 | 8/17/2000 | 8/17/2000 | A | PASS |
Dave Lightfoot
|
|
|
Nikki ###-####
|
Rough-in | 8/15/2000 | 8/17/2000 | 8/17/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Nikki ###-#### c/n posted 8/17/2000 11:23:30 AM
|