Final | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 13:16:59. Contact: ###-####.
|
Final | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 10:25:15. Contact: ###-####.
|
Pressure Test | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 12:25:06. Contact: ###-####. need cabinet clearance to cook top 8/17/2000 11:21:49 AM
|