Final | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 16:28:48. Contact: ###-####. sign occ card 9/28/2000 11:50:19 AM
|
Final | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 10:57:02. Contact: ###-####. need paper work from engineer 9/27/2000 3:12:00 PM
|
Final | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 14:41:46. Contact: ###-####. c/n posted 9/26/2000 12:05:43 PM
|
Conference | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 12:56:58. Contact: ###-####.
|
Conference | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | CANC |
Alan Hauser
|
|
|
had contractor recall to meet with dave l 8/31/2000 12:40:30 PM
|