Final | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 09:17:15. Contact: ###-####.
|
Final | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 09:26:35. Contact: ###-####.
|
Pressure Test | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PASS |
Tom Arcoraci
|
|
|
ANDREA-- ###-#### PRES TEST
|
Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PASS |
Tom Arcoraci
|
|
|
ANDREA ###-#### R/I
|
Pressure Test | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | NR |
Dixie Fellows
|
|
|
ANDREA-- ###-#### PRES TEST
|
Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | NR |
Dixie Fellows
|
|
|
ANDREA-- ###-#### R/I
|