Final | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 09:57:38. Contact: ###-####.
|
Pressure Test | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Called 8/31/2000 1:58:54 PM
|
Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Alan Hauser
|
|
|
JEFF ###-#### R/I
|