Pressure Test | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 09:25:18. Contact: ###-####.
|
Final | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 08:14:21. Contact: ###-####. c/n posted 10/10/2000 3:10:09 PM
|
Pressure Test | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 08:13:55. Contact: ###-####.
|
Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Alan Hauser
|
|
|
furnace and bath fan ###-####
|