Final | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 09:04:38. Contact: ###-####.--KEY OVER FRONT DOOR
|
Pressure Test | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Dixie Fellows
|
|
|
liberty ###-#### done by 407 on 9-1-00 9/5/2000 2:02:53 PM
|
Pressure Test | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 08:23:46. Contact: ###-####.
|
Pressure Test | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 09:09:59. Contact: ###-####.
|
Rough-in | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 09:09:17. Contact: ###-####.
|