Final | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 08:03:40. Contact: ###-####.
|
Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PASS |
Dixie Fellows
|
|
|
Liberty Heating ###-####
|
Pressure Test | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 09:23:12. Contact: ###-####.
|
Rough-in | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 09:22:39. Contact: ###-####. need comb air to w/h 9/1/2000 12:55:04 PM
|