Final | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 11:22:48. Contact: ###-####.
|
Pressure Test | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | FAIL |
Alan Hauser
|
|
|
done by #411 9/6/2000 8:29:10 AM
|
Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 9/5/2000
|
Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | FAIL |
Alan Hauser
|
|
|
done by #411 9/6/2000 8:28:14 AM
|