Final | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 08:23:10. Contact: ###-####.
|
Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 14:36:05. Contact: ###-####.
|
Rough-in | 9/7/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 9/7/2000
|
Rough-in | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 08:08:08. Contact: ###-####.
|