Final | 10/17/2000 | 10/18/2000 | 10/18/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 13:46:27. Contact: ###-####.door code 0987
|
Pressure Test | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 14:46:53. Contact: ###-####.
|
Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 14:46:26. Contact: ###-####. need to insp f/p also
|