Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 08:26:47. Contact: ###-####.
|
Rough-in | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 14:21:55. Contact: ###-####.
|
Pressure Test | 9/13/2000 | 9/13/2000 | 9/13/2000 | A | PASS |
|
|
|
Added by Inspector: 338 On 9/13/2000 25# 30# ga
|
Rough-in | 9/13/2000 | 9/13/2000 | 9/13/2000 | A | PASS |
|
|
|
Added by Inspector: 338 On 9/13/2000 made ok to cover
|
Rough-in | 9/12/2000 | 9/13/2000 | 9/13/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 17:06:54. Contact: ###-####. trans to p paine in the area. 9/13/2000 10:15:40 AM
|