Pressure Test | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 9/28/2000
|
Pressure Test | 9/26/2000 | 9/26/2000 | 9/27/2000 | A | CANC |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 9/26/2000 doug
|
Final | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | NR |
Dixie Fellows
|
|
|
###-#### fireplace will do wed am 9/26/2000 4:05:29 PM
|
Pressure Test | 9/25/2000 | 9/26/2000 | 9/26/2000 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 17:21:07. Contact: ###-####.
|
Final | 9/25/2000 | 9/26/2000 | 9/25/2000 | A | CANC |
Russ Owen
|
|
|
fn-- shawna ###-#### Disp set to [CANC] by a contractor via Hello! on 09/25/2000 at 17:17:36.
|
Pressure Test | 9/25/2000 | 9/26/2000 | 9/25/2000 | A | CANC |
Russ Owen
|
|
|
pres test shawna ###-#### Disp set to [CANC] by a contractor via Hello! on 09/25/2000 at 17:18:12.
|
Final | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 14:18:03. Contact: ###-####.gas test failed. 9/25/2000 1:06:49 PM
|
Final | 9/21/2000 | 9/22/2000 | 9/22/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 14:47:54. Contact: ###-####. not ready 9/22/2000 3:00:13 PM
|