Final | 11/21/2000 | 11/21/2000 | 11/21/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 11:07:57. Contact: ###-####.
|
Pressure Test | 10/9/2000 | 10/10/2000 | 10/10/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/09/2000 at 17:02:05. Contact: ###-####.50 lbs, c/n, covered???
10/10/2000 9:37:34 AM
|
Pressure Test | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PASS |
Alan Hauser
|
|
|
reinspection for p/t only as per carl d inspector
|
Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 08:49:58. Contact: ###-####.
|
Rough-in | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | FAIL |
Alan Hauser
|
|
|
Val Hill ###-#### r/i p/t
|