Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
Final | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 07:57:31. Contact: ###-####. No access....Left voice message with HVAC contractor. 11/13/2000 2:41:11 PM
|
Pressure Test | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 08:26:48. Contact: ###-####.
|
Rough-in | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 08:26:23. Contact: ###-####.
|