Final | 11/22/2000 | 11/24/2000 | 11/24/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 14:58:19. Contact: ###-####.
|
Pressure Test | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PASS |
Dixie Fellows
|
|
|
DESIGN AIR ###-#### PRES TEST
|
Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PASS |
Dixie Fellows
|
|
|
DESIGN AIR ###-#### R/I
|