Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 16:56:01. Contact: ###-####.
|
Rough-in | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 12:02:58. Contact: ###-####.
|
Rough-in | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | PART |
Dixie Fellows
|
|
|
and pressure test Carol ###-#### r/i --n/r...gas ok 10/12/2000 10:36:33 AM.....off brumback--8th 10/12/2000 10:40:08 AM
|