Final | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 09:02:56. Contact: ###-####.
|
Final | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 11:10:17. Contact: ###-####. need upper and lower comb air..prv to term outside 1/11/2001 2:23:14 PM
|
Rough-in | 10/17/2000 | 10/18/2000 | 10/18/2000 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 14:53:25. Contact: ###-####. ceiling r/i upstairs ok 10/18/2000 10:19:51 AM
|