Permit Information
Permit NumberMEC00-03410
StatusFinaled
Name TOTAL SYSTEM SERVICES INC
Site Address 202 N CAPITOL BLVD
Project NameADELMAN BLDG-1ST FLR
Customer Number 
ePlanReview 
Description
10/6/00-$54,000.00-HVAC**Mechanical remodel: RTU'S, Ducting, exhaust fans-Initial cert. of value.mps ADDRESS CHANGED FROM 622 W IDAHO PER JIM RICH 6/5/2001/PE
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/12/200110/12/200110/12/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/12/2001 7:55:14 AM prev. ok'd per 337
Final5/18/20015/18/20015/18/2001PPASS
DetailsDave Lightfoot
Steve ###-#### after 1:30 sign occ card 5/18/2001 2:44:39 PM
Final5/16/20015/17/20015/17/2001ANR
DetailsDave Lightfoot
###-####
Rough-in5/11/20015/11/20015/11/2001PPASS
DetailsDave Lightfoot
Rough-in5/2/20015/2/20015/2/2001PFAIL
DetailsDave Lightfoot
1st floor roof and the basement steve ###-#### c/n posted 5/2/2001 2:33:11 PM
Rough-in3/27/20013/28/20013/28/2001APART
DetailsAlan Hauser
1st flr. ceilings ok for cover 3/28/2001 11:08:17 AM
Pressure Test3/13/20013/14/20013/14/2001APASS
DetailsDave Lightfoot
reinspection Steve ###-####
Pressure Test3/12/20013/13/20013/13/2001PFAIL
DetailsDave Lightfoot
###-#### Steve Miller not per plan 3/13/2001 2:32:36 PM
Rough-in2/20/20012/21/20012/21/2001ANR
DetailsDave Lightfoot
Conference2/14/20012/15/20012/15/2001APART
DetailsCarl Dependahl
###-####; RE DAMPERS AT SHAFT 2/15/2001 11:52:30 AM
Conference2/14/20012/15/20012/15/2001APART
DetailsCarl Dependahl
###-####; RE DAMPERS AT SHAFT 2/15/2001 11:52:30 AM
Rough-in2/15/20012/15/20012/15/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/15/2001 2:38:51 PM dampers installed at upper floor termination at all 3 hvac ducts at "future" duct shaft
Rough-in2/15/20012/15/20012/15/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/15/2001 2:38:51 PM dampers installed at upper floor termination at all 3 hvac ducts at "future" duct shaft
Rough-in1/31/20011/31/20011/31/2001PPART
DetailsDave Lightfoot
###-#### partial rough in 1st floor f/d 1/31/2001 3:04:24 PM
Rough-in1/17/20011/18/20011/18/2001APART
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 01/17/2001 at 13:26:27. Contact: ###-####. 2nd floor s f d only ok 1/18/2001 10:00:11 AM
Rough-in1/4/20011/5/20011/5/2001APART
DetailsJim Storey
DERRICK ###-#### R/I make up air duct per engineering and engineering in dave lightfoots box for archive. 1/5/2001 5:28:18 PM
Conference12/12/200012/13/200012/13/2000APASS
DetailsDave Lightfoot
###-####
Rough-in11/27/200011/27/200011/27/2000PNR
DetailsDave Lightfoot
partial r/i-- derrick-- ###-####
Rough-in11/21/200011/22/200011/22/2000ANR
DetailsDave Lightfoot
###-####
Rough-in11/22/200011/22/200011/22/2000PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/22/2000 at 09:15:08. Contact: .