Final | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Dave Lightfoot
|
|
|
FINAL \\###-####
|
Final | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | PART |
Dave Lightfoot
|
|
|
another pressure test for a gas range Shane ###-#### gas test for range ok 12/5/2000 11:15:59 AM
|
Rough-in | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 08:14:43. Contact: ###-####.
|
Rough-in | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 08:23:32. Contact: ###-####.Previous c/n 2" at top of vent pipe has be gained by lowering pie and now does not have 1/4" per foot rise new c/n posted. 10/16/2000 2:16:05 PM
|
Rough-in | 10/13/2000 | 10/13/2000 | 10/13/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 08:32:30. Contact: ###-####. need 2"clear above top of f/p vent 10/13/2000 1:24:47 PM
|
Rough-in | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 14:30:36. Contact: ###-####. need f/p instructions dryer vent in 31/2 in wall 10/12/2000 11:05:27 AM
|