Final | 5/11/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Dave Lightfoot
|
|
|
###-#### key on the fence at 2X4 post. ON the left
|
Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 09:14:28. Contact: .
|
Rough-in | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 08:39:18. Contact: . gas fail..r/i ok...no phone # to call 10/20/2000 2:14:52 PM
|
Final | 10/13/2000 | 10/16/2000 | 10/16/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 14:16:53. Contact: . done by 337 10/16/2000 2:02:23 PM
|