Final | 5/11/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Dave Lightfoot
|
|
|
###-####
|
Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 09:15:30. Contact: .
|
Rough-in | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 08:40:20. Contact: . gas ok..strap bath exhausts ..no phone # to call 10/20/2000 2:15:13 PM
|
Final | 10/13/2000 | 10/16/2000 | 10/16/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 14:17:57. Contact: . done by 337 10/16/2000 2:02:30 PM
|