Final | 2/26/2001 | 2/26/2001 | 2/26/2001 | P | PASS |
Dixie Fellows
|
|
|
###-#### Sheila
|
Final | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | FAIL |
Dixie Fellows
|
|
|
has to go to Dixie Randy ###-#### corrections called randy 2/21/2001 2:29:44 PM
|
Final | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | CANC |
Dave Hannah
|
|
|
###-#### call first
|
Final | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | NR |
Dixie Fellows
|
|
|
###-####
|
Final | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | FAIL |
Tony Young
|
|
|
###-####
c/n posted,, need to finish all componets 2/6/2001 1:48:42 PM
|
Pressure Test | 10/17/2000 | 10/18/2000 | 10/18/2000 | A | PASS |
Dixie Fellows
|
|
|
as per dixie 20lb..2f-2wh-d-fp-r-3bbq 10/18/2000 9:43:41 AM
|
Rough-in | 10/17/2000 | 10/18/2000 | 10/18/2000 | A | PASS |
Dixie Fellows
|
|
|
randy ###-#### reinspection fresh air..comb air..dryervent coming through foundation vents 10/18/2000 9:43:07 AM
|
Pressure Test | 10/13/2000 | 10/16/2000 | 10/16/2000 | P | FAIL |
Dixie Fellows
|
|
|
undersized and no guage 10/16/2000 1:58:34 PM
|
Rough-in | 10/13/2000 | 10/16/2000 | 10/16/2000 | P | FAIL |
Dixie Fellows
|
|
|
###-#### ..posted corrections 10/16/2000 1:58:50 PM
|