Final | 3/29/2001 | 3/29/2001 | 3/29/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 09:45:04. Contact: ###-####. sign occ card 3/29/2001 3:25:56 PM
|
Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 08:34:13. Contact: ###-####. corrections on f/p..called sandy 11/30/2000 4:03:57 PM
|
Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 12:13:43. Contact: ###-####. gas pipe undersized..need specs for f/p..comb air to come from outside if using
one upper 11/29/2000 11:37:52 AM
|
Pressure Test | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 10:28:34. Contact: ###-####. short pipe below grade ok 10/17/2000 3:07:58 PM
|