Rough-in | 11/10/2000 | 11/13/2000 | 11/13/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 14:16:49. Contact: ###-####. wrong permit # called in 11/13/2000 10:34:33 AM
|
Final | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 17:01:47. Contact: ###-####.
|