Final | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 09:00:13. Contact: ###-####.
|
Final | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 11:08:13. Contact: ###-####.
|
Pressure Test | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | PASS |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 11/6/2000 | 11/3/2000 | 11/4/2000 | A | FAIL |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 11/6/2000
|
Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 16:00:13. Contact: ###-####....*1010 11/3/2000 9:34:34 AM r/i fail...gas undersized 11/3/2000 10:10:43 AM
|
Rough-in | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 11:10:36. Contact: ###-####.c/n posted one gas test failed. 3 total. 11/3/2000 10:44:51 AM
|