Final | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 13:23:54. Contact: ###-####.
|
Pressure Test | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 09:49:03. Contact: ###-####.
|
Rough-in | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 09:48:36. Contact: 10/25/2000 1:00:17 PM
|