Pressure Test | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | FAIL |
Alan Hauser
|
|
|
witnessed gas co. 10/30/2000 12:11:17 PM
|
Pressure Test | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 13:34:23. Contact: ###-####. P/T failed 10/27/2000 10:49:06 AM
|
Pressure Test | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | CANC |
Dave Lightfoot
|
|
|
RE-INSP PRES TEST-- LAURINDA ###-#### no time 10/27/2000 3:57:03 PM
|
Pressure Test | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | FAIL |
Carl Dependahl
|
|
|
c/n, support, p.t. failed; verify sizing 10/25/2000 11:44:09 AM
|