Final | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 15:25:44. Contact: ###-####. 11/30/2000 10:24:38 AM
|
Final | 11/21/2000 | 11/24/2000 | 11/24/2000 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:01:16. Contact: ###-####. 11/24/2000 12:51:22 PM no fireplace installed. 11/24/2000 12:51:38 PM
|
Pressure Test | 10/30/2000 | 10/31/2000 | 10/31/2000 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 15:31:56. Contact: ###-####...###-#### 10/31/2000 12:46:16 PM
|