Final | 11/8/2000 | 11/8/2000 | 11/8/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/08/2000 at 08:42:24. Contact: ###-####.
|
Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 15:54:55. Contact: ###-####...###-#### 11/7/2000 8:34:18 AM f/p insert inside ok..only gas test failed..called shawna 11/7/2000 8:52:39 AM
|