Final | 1/19/2001 | 1/22/2001 | 1/22/2001 | A | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 1/5/2001 | 1/8/2001 | 1/8/2001 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 17:54:04. Contact: ###-####.
|
Final | 1/8/2001 | 1/8/2001 | 1/8/2001 | A | FAIL |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 1/8/2001 11:48:58 AM removce screen from both combustion air
|
Rough-in | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | CANC |
Dave Lightfoot
|
|
|
R/I -RE-INSP ARLEN-- ###-#### done by 350 in the am 11/14/2000 3:05:22 PM
|
Rough-in | 11/13/2000 | 11/13/2000 | 11/13/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 10:45:12. Contact: ###-####.
|
Conference | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Alan Hauser
|
|
|
FOR CONF- ###-####- ROY OR CELL ###-####
|
Rough-in | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Kerri ###-#### c/n posted 10/27/2000 3:57:47 PM
|