Final | 12/10/2000 | 12/11/2000 | 12/11/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/10/2000 at 11:47:47. Contact: ###-####. finaled with no doors on dryer closet 12/11/2000 11:53:10 AM
|
Final | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | FAIL |
Dixie Fellows
|
|
|
need clarification on addresses 12/8/2000 11:35:24 AM..insulate plenums--100sq in cut in dryer closet--1" at side of furnace. 12/8/2000 12:31:17 PM
|
Pressure Test | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | PASS |
Dixie Fellows
|
|
|
###-#### done by 407 11/1/2000 9:11:38 AM
|
Pressure Test | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PART |
Tom Arcoraci
|
|
|
reinspection ###-#### tom 10/31/2000 10:28:11 AM one unit fail 10/31/2000 10:28:51 AM
|
Rough-in | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | FAIL |
Tom Arcoraci
|
|
|
reinspection tom ###-####
|
Pressure Test | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | FAIL |
Alan Hauser
|
|
|
TOM ###-####
|
Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | FAIL |
Alan Hauser
|
|
|
TOM ###-####
|