Final | 12/20/2000 | 12/20/2000 | 12/20/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 08:35:29. Contact: ###-####. sign occ card 12/20/2000 2:28:10 PM
|
Rough-in | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 15:56:12. Contact: ###-####.
|
Rough-in | 12/18/2000 | 12/19/2000 | 12/19/2000 | A | PART |
Dave Lightfoot
|
|
|
3RD FLOOR R/I ABOVE CEILING -AMANDA ###-####
|
Rough-in | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 14:03:31. Contact: ###-####.R/I ON THE NORTH SIDE OF THE 3RD FL
|
Final | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 11:55:29. Contact: ###-####. sign occ card 11/17/2000 9:43:03 AM
|
Rough-in | 11/14/2000 | 11/16/2000 | 11/16/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 12:06:24. Contact: ###-####.
|
Rough-in | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 09:28:39. Contact: ###-####.above ceiling on 2nd floor
|
Rough-in | 11/2/2000 | 11/6/2000 | 11/6/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 15:20:57. Contact: ###-####. part 2nd floor r/i ok 11/6/2000 11:39:34 AM
|
Rough-in | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 15:00:26. Contact: ###-####. 2 hard ceiling areas off 2nd fl lobby 11/2/2000 10:35:50 AM
|
Rough-in | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | CANC |
Dave Lightfoot
|
|
|
partial r/i for cover on 2nd floor ###-####
|