Final | 1/25/2001 | 1/25/2001 | 1/25/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 08:42:28. Contact: ###-####. sign occ card 1/25/2001 2:27:20 PM
|
Rough-in | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 09:17:21. Contact: ###-####.
|
Rough-in | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/03/2000 at 12:12:04. Contact: ###-####. the bldg has not been built yet 11/6/2000 11:41:29 AM
|