Final | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 09:31:21. Contact: ###-####.
|
Rough-in | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | CANC |
Dave Lightfoot
|
|
|
mike-- ###-#### r/i--re-insp done by building inspector 11/27/2000 3:44:48 PM
|
Rough-in | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 11/27/2000 3:21:36 PM
|
Rough-in | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | FAIL |
Dixie Fellows
|
|
|
###-#### comb air to come from outside 11/22/2000 9:58:41 AM
|
Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 08:33:47. Contact: ###-####.combustion air. 11/17/2000 1:02:38 PM
|